Initially, the CO
2 savings were 67% less than had originally been predicted for this renewable energy installation.
Once the problems had been located and remedied and the control systems had been optimised
the CO
2 savings were 24% better than what had originally been predicted.
Commissioning and Monitoring are critical to achieving good results.
You need to plan for a "soft landing".